Neubaustrecke Wendlingen–Ulm
CompletedPart of Stuttgart 21
- Length
- 59.6 km
- Max Speed
- 250 km/h
- Cost
- 4.0 bn EUR
- Responsible
- DB InfraGO AG
- Corridor
- Stuttgart–Ulm
Travel Time Impact
Stuttgart Hbf → Ulm Hbf
Before
54 min
After
28 min
Timeline
Feb. 2001
Project StartTarget completion: Dez. 2019Juli 2008
PlanfeststellungTarget completion: Dez. 2019Juni 2012
Construction StartTarget completion: Dez. 2022Revised target after geological issues in AlbaufstiegDez. 2022
Section CompletedGesamtstreckeTarget completion: Dez. 2022Dez. 2022
CompletedA 59.6 km high-speed line through the Swabian Jura, connecting the Stuttgart region with Ulm. Its centrepiece is the Albaufstieg with the Boßlertunnel (8.8 km), the Filstalbrücke viaduct (485 m, 85 m high), and the Steinbühltunnel (4.8 km). Opened in December 2022, it cuts the Stuttgart–Ulm travel time from 54 to 28 minutes.